4T Trail from OHSU

  • extended shoulder with no parking north side of Marquam Hill Road from Gibbs to Fairmont (also serves Trail 1).
  • Extended extended shoulder with no parking east side of Fairmount Blvd from Marquam Hill Road to 4T Trail to Council Crest (also seres Trail 1, 6).
  • Sidewalk on SW Talbot from SW Fairmount to SW Patton
  • Zebra striping on crossings of SW Greenway, SW Fairmount and SW Sherwood Drive

Walking alternate when the tram is not working:

  • Repair trail from Barbur to Terwilliger by
    • replacing 10 steps,
    • replacing walkway with 120 feet of concrete sidewalk,
    • installling handrail on 200 feet of stairs, and
    • installing lighting from Barbur to Terwilliger.
  • New crossing of Naito at SW Whitaker with HAWK signal, new signage from east end of Hooley Bridge to Terwilliger Blvd.
  • These improvements from OHSU to the Hooley Bridge are also listed in the Trail 1 improvements.

Trail 1

  • New crossing of Naito at SW Whitaker with HAWK signal,
  • new signage from east end of Hooley Bridge to Terwilliger Blvd,
  • repair trail from Barbur to Terwilliger by
    • replacing 10 steps,
    • replacing walkway with 120 feet of concrete sidewalk,
    • installling handrail on 200 feet of stairs, and
    • installing lighting from Barbur to Terwilliger.
  • Marquam Road as noted above on 4T Trail to OHSU,
  • Fairmount as noted above on 4T Trail to OHSU.
  • Extended shoulder with no parking on SW Dosch from Dosch Park Lane to SW Mitchell,
  • extended shoulder with no parking on SW Hamilton from 53rd to Scholls Ferry Road.

Trail 3

  • Rebuild stairs under I5 bridge (should be done by summer 2014 by ODOT).
  • Zebra crossing of Terwilliger at Nebraska (will also serve Red Electric).
  • Stairs on west side of Capitol Hwy on Nevada Ct.,
  • Zebra crossing, already approved, of SW 45th west of Gabriel Park,
  • easement and new trail in Presbyterian Church property (easement in process), improve existing trail,
  • zebra crossing of Maplewood Road at SW 48th,
  • reroute trail from 60th west along SW Miles Court to Olsen (Red Electric Trail Connection) to Fanno Creek Trail at Garden Home Rec Center.

Trail 4

  • Handrail on stairs from Canby to Canby at SW 10th.
  • Extended shoulder with no parking on SW Capitol Hill Road from SW Moss to SW to SW Troy.

Trail 5

  • Gain agreement from Lewis and Clark for route through their property to Palatine Hill Road and Riverside and connection to Boones Ferry Road.
  • Build new ped bike bridge over I5 and Barbur to SW 52nd
  • reroute trail 5 there.
  • build sidewalk along south side of Taylors Ferry Road from Capitol Hwy to SW 48th as needed.
  • Build Asphalt trail connection on ROW from end of 52nd to Ash Creek Natural Area.
  • Relocate trail from Dickinson to Huddleston, 62nd Drive, and 64th Drive, and through BES property to county line where it will run on streets to Metsger Park.

Trail 6

  • Take legal action to require condos to build the trail specified in their original building permit from Cable to Montgomery,
  • build trail in steps to Montgomery,
  • obtain easement to build trail from Montgomery up to SW 18th and SW Jackson.
  • install extended shoulders with no parking or sidewalk on SW Montgomery from SW Vista to about SW 15th.
  • Install zebra crossing of SW Broadway at SW Gerald, Sidewalk along east/south of SW Broadway from Gerald to SW Sherwood Drive <200 feet.
  • Extended Shoulder with no parking on SW Cheltenham Ct from SW Westwood Drive to SW Cheltenham,
  • sidewalk along SW Dewitt south side from Cheltenham Ct to Library.
  • Trail 6 is also the Hillsdale to Lake Oswego Regional Pedestrian Trail from SW Sunset in Hillsdale to the Willamette Greenway Trail in Lake Oswego.
  • On school property, between Wilson and Rieke, remove center stakes on walkway as planned for neighborhood greenway.
  • On Capitol Hill Road sidewalk from SW 17th to SW 19th.
  • Pave pathway on all of SW 19th from Capitol Hill Road to Moss,
  • and 19th from Dolph to Taylor’s Ferry Road.
  • Sidewalk on Taylor’s Ferry Road from 19th to SW 18th Place,
  • on 18th Place sidewalk from Taylor’s Ferry Road to the entrance to Marshall Park.
  • New trail in on Oregon State Parks and Metro lands connecting to a new underpass of SW Boone’s Ferry Road along Tryon Creek currently being designed by BES.
  • New sidewalk on Boone’s Ferry Road from new underpass to the entrance to Tryon Creek State Park to the south.

Trail 7

  • at the Oregon Zoo freeway off-ramp, ODOT new rapid flashing beacon for hwy 26 exit from the freeway with zebra striping, and
  • ODOT zebra striping on 2nd off ramp crossing.
  • ODOT Zebra crossing of on ramp on south side of hwy 26.
  • extended shoulder with no parking on east side of Dosch from Paton to to Bridalmile Lane,
  • zebra crossing of SW Hamilton at SW 36th,
  • extended shoulder with no parking from SW 36 to SW 37th.
  • New steps from SW Beaverton Hillsdale Hwy to Fairvale Court.
  • New zebra crossing of Vermont at SW Idaho.
  • Zebra crossing of Taylors Ferry Road at SW 43rd.
  • Sidewalk on SW Pomona from from SW 49th to SW 51st,

Red Electric

  • Zebra crossing of SW Corbett at SW Seymour
  • new paved ped bike facility from the existing end of Slavin Road to Barbur at south end of Newbury structure,
  • new bridge across Iowa Street Gully,
  • new trail under Barbur up to Parkhill Drive,
  • pedestrian connection to existing trail in Himes Park,
  • New trail along the old Red Electric rail alignment from SW 33rd and SW Bertha to Olsen Road.