PBOT Delays Construction on Red Electric Trail bridge

In February, PBOT announced that a long-awaited bridge to be constructed across a ravine near Beaverton-Hillsdale Highway, a critical piece of the Red Electric trail and a potential boon to SW walkers in the Hillsdale area is to be delayed to due elevated construction costs. Here’s the link to PBOT’s press release:

https://content.govdelivery.com/accounts/ORPORTLAND/bulletins/22def33

The delay was the focus of a recent article in the Southwest Connection, which included comments from SWTrails board members Don Baack, Glen Bridger and Debbie Small. Read the article here:

https://portlandtribune.com/pt/9-news/419925-323939-pbot-postpones-construction-of-west-hillsdale-bridge-that-would-make-you-feel-like-youre-in-the-trees

This entry was posted in Walks. Bookmark the permalink.