Success! April Hill Park Trail

April Hill Park work party of November 2017

SWTrails work party built a trail in April Hill park connecting the playground and the boardwalk through the natural area. The trail is 300 feet long, 30 inches wide and 3 inches deep.

This entry was posted in Uncategorized. Bookmark the permalink.